top of page

Project Information

260429_birdseye render_no harborwalk.png

Graphical Rendering Depiction of Project at Completion -Not to Scale, Not Final

​The City of Boston’s new BCYF North End Community Center will be a modern, approximately 54,000-square-foot facility designed to replace the existing Nazzaro Center and serve residents of all ages. Located adjacent to the Mirabella Pool along Commercial Street in the North End, the project will include a gymnasium, classrooms, fitness studios, and multipurpose community spaces.

Project Renderings - North and South Views

image.png

BCYF North End Community Center Building

View From Commercial Street

image.png

BCYF North End Community Center Building

View From North/Ocean Side

Graphical Renderings Depiction of Project at Completion -Not to Scale, Not Final

a476a263-5694-4df4-9455-4e5255bfce31_2.png

Graphical Rendering Depiction of Project during Demolition -Not to Scale, Not Final

Demolition/Project Setup Rendering

General Demolition Depiction/Plan
 

X

The white circles in the Demolition Depiction show where other street view renderings are located. See below for different views from the street
 
Click on the PDF icon to download the (draft) Construction Management Plan with the crosswalk, bike path, and signage changes

​

a476a263-5694-4df4-9455-4e5255bfce31_7.png

Graphical Rendering Depiction of Project -Not to Scale, Not Final

Detail/Close up of site entrance 

Graphical Depiction of Construction on site
 

Project Setup Rendering

a476a263-5694-4df4-9455-4e5255bfce31_8.png

Graphical Rendering Depiction of Project -Not to Scale, Not Final

View of Site from across Commercial Street

Approximate location is Commercial St @ Foster St

View from Commercial Street
Driving East

a476a263-5694-4df4-9455-4e5255bfce31_9.png

Graphical Rendering Depiction of Project  -Not to Scale, Not Final

Approximate location is Commercial Street @ Jackson Ave
Bike Path changes from shared street to separated path
 

View from Commercial Street
Driving East

a476a263-5694-4df4-9455-4e5255bfce31_10.png

Graphical Rendering Depiction of Project -Not to Scale, Not Final

Approximate location is 500 Commercial Street
Two lanes of traffic with north lane sharing with bikes
 

View from Commercial Street
Driving East

a476a263-5694-4df4-9455-4e5255bfce31_11.png

Graphical Rendering Depiction of Project -Not to Scale, Not Final

Approximate location is 450 Commercial Street (at intersection with Henchman street), the Coast Guard Building to the right. Sidewalk closed to pedestrians and bikes, crosswalk to southern sidewalk approximately at this location
There will be one rapid flashing beacon on both sides of the street (two total) and added tactile warning strips (not show on rendering) at the cross walk. 

 

View from Commercial Street
Driving East

a476a263-5694-4df4-9455-4e5255bfce31_12.png

Graphical Rendering Depiction of Project -Not to Scale, Not Final

Approximate location is 471 Commercial Street
Jobsite Entrance

View from Commercial Street
Driving East

a476a263-5694-4df4-9455-4e5255bfce31_13.png

Graphical Rendering Depiction of Project -Not to Scale, Not Final

Approximate location is on the Boston Harbor, off the coast of the Langone Park Basketball Court

View from Boston Harbor

Project Team

PFD Logo Blue.png

Owner

PMA Logo Blue.jpg

OPM

sasaki_logo_RGB-05 (002).png

Architect

d1759435-1238-4cae-86ed-4ba237c98187.png

General Contractor

bottom of page